Bataan Peninsula State University
Amazon cover image
Image from Amazon.com
Image from Google Jackets

Accelerated bridge construction : best practices and techniques / Mohiuddin Ali Khan Ph.D., M. Phil., DIC, P.E., Chartered Engineer (England) Chartered Member, SEI of ASCE, Consulting Engineer and Adjunct Professor at Temple University, USA.

By: Material type: TextTextPublisher: Amsterdam ; Boston : Elsevier/BH, Butterworth-Heinemann is an imprint of Elsevier, [2015]Description: xiv, 584 pages ; 24 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
ISBN:
  • 9780124072244
Subject(s): DDC classification:
  • 624.2 23
LOC classification:
  • TG300 .K43 2015
Summary: The traveling public has no patience for prolonged high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of Accelerated Bridge Construction (ABC) construction programs in the United States, Europe and Japan. This book provides a wide range of construction techniques, processes and technologies designed to maximize bridge construction and reconstruction operations while minimizing project delays and community disruptions. • Describes design using methods for accelerated bridge structure construction; reducing foundation construction time and methods by using pile bents. • Explains applications to steel bridges, temporary bridges in place of detours using quick erection and demolition. • Covers design build systems boon to ABC; development of software; use of fiber reinforced polymer(FRP) • Includes applications to glulam and sawn lumber bridges, precast concrete bridges, precast joins details; use of light weight aggregate concrete, aluminum and high performance steel.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Date due Barcode
Books Main Library Reserve 624.2 K45 (Browse shelf(Opens below)) Available 3BPSU00017655Z

The traveling public has no patience for prolonged high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of Accelerated Bridge Construction (ABC) construction programs in the United States, Europe and Japan. This book provides a wide range of construction techniques, processes and technologies designed to maximize bridge construction and reconstruction operations while minimizing project delays and community disruptions. • Describes design using methods for accelerated bridge structure construction; reducing foundation construction time and methods by using pile bents. • Explains applications to steel bridges, temporary bridges in place of detours using quick erection and demolition. • Covers design build systems boon to ABC; development of software; use of fiber reinforced polymer(FRP) • Includes applications to glulam and sawn lumber bridges, precast concrete bridges, precast joins details; use of light weight aggregate concrete, aluminum and high performance steel.

Professional.

There are no comments on this title.

to post a comment.
Bataan Peninsula State University

  All rights Reserved
  Bataan Peninsula State University
  © 2024

Branches :

Abucay Campus: Bangkal, Abucay, Bataan, 2114
Bagac Campus: Bagumbayan, Bagac, Bataan 2107
Balanga Campus: Don Manuel Banzon Ave., Poblacion, City of Balanga, Bataan 2100
Dinalupihan Campus: San Ramon, Dinalupihan, Bataan, 2110
Orani Campus: Bayan, Orani, Bataan, 2112
Main Campus: Capitol Compound, Tenejero, City of Balanga, Bataan 2100

Powered by Koha